Find product data, installation-planning guidance, care instructions and warranty forms. Each publication shows its current issue, revision and date for straightforward project coordination.

Public documents
10
Current issue
01
Current revision
03

Current public editions

Current editions. Clearly identified.

Each PDF identifies its document code, issue, revision, publication date, page count, scope, and current-record address. Public links point only to the approved edition in this register.

Current register date: September 4, 2026

Download SHA-256 integrity manifest

Product data

Current profile geometry, product availability, gauge status, and supplier-reported material information.

Cover of Current Product and Material Data Guide
TS-DAT-210Current

Current Product and Material Data Guide

Profile geometry, common steel gauges, broader project supply, Core names, colour references and material-specific review boundaries.

Products
TerraGroove 300, TerraLap 200, TerraCrest 100 and 200
Audience
Purchasers, designers, contractors, and submittal teams
Issue / Rev
01 / 04
Pages
8
File
1.8 MB
Published
September 11, 2026
Download PDF

Planning & care

Product-specific field-coordination, inspection and cleaning guidance for project teams and owners.

Cover of Architectural Wall Panels: Installation Planning and Field Coordination
TS-INS-300Current

Architectural Wall Panels: Installation Planning and Field Coordination

Product identification, wall readiness, orientation, field coordination and required warranty closeout records.

Products
TerraGroove 300 and TerraLap 200
Audience
Designers, contractors, installers, and inspectors
Issue / Rev
01 / 04
Pages
10
File
2.4 MB
Published
September 11, 2026
Download PDF
Cover of TerraCrest Roof and Wall Panels: Project Planning and Field Coordination
TS-INS-310Current

TerraCrest Roof and Wall Panels: Project Planning and Field Coordination

Project-gated roof and wall planning, verified profile identification, field controls and required closeout records.

Products
TerraCrest 100 and TerraCrest 200
Audience
Designers, contractors, installers, and inspectors
Issue / Rev
01 / 04
Pages
10
File
1.7 MB
Published
September 11, 2026
Download PDF
Cover of Product Care and Maintenance Guide
TS-CAR-200Current

Product Care and Maintenance Guide

Receiving, handling, storage and compatible cleaning guidance, with required washing intervals, inspections and photographic records.

Products
Current Terrashield panels, flashings, and trim
Audience
Receivers, installers, owners, and facility managers
Issue / Rev
01 / 04
Pages
6
File
1.0 MB
Published
September 11, 2026
Download PDF

Warranty & forms

The current coating and product warranty, required registration, claim form, project certificate, transfer request and maintenance log.

Cover of Conditional Coating and Product Warranty
TS-WAR-100Current

Conditional Coating and Product Warranty

Eligible 40-year and 25-year finish classes, coverage and assessment limits, required care, claims, remedies and transfers.

Products
Certificate-listed eligible material
Audience
Purchasers, owners and project administrators
Issue / Rev
01 / 04
Pages
6
File
205 KB
Published
September 11, 2026
Download PDF
Cover of Required Warranty Registration
TS-WAR-110Current

Required Warranty Registration

Record the purchaser, installation, material and photographs. Submit within 30 days after completed installation for Terrashield approval.

Products
Certificate-listed eligible material
Audience
Purchasers, owners and project administrators
Issue / Rev
01 / 04
Pages
2
File
222 KB
Published
September 11, 2026
Download PDF
Cover of Warranty Claim Form
TS-WAR-120Current

Warranty Claim Form

Notify Terrashield within 30 days after discovery and identify the affected material, Certificate, purchase, care records and inspection arrangements.

Products
Certificate-listed eligible material
Audience
Purchasers, owners and project administrators
Issue / Rev
01 / 04
Pages
2
File
215 KB
Published
September 11, 2026
Download PDF
Cover of Project Warranty Certificate
TS-WAR-130Current

Project Warranty Certificate

Terrashield's signed record of the covered material, coating attributes, periods, assessment limits and remedy for your order.

Products
Certificate-listed eligible material
Audience
Purchasers, owners and project administrators
Issue / Rev
01 / 04
Pages
2
File
227 KB
Published
September 11, 2026
Download PDF
Cover of Warranty Transfer Request
TS-WAR-140Current

Warranty Transfer Request

Request authorization of remaining coverage within 30 days of new owner possession, with the Certificate, original purchase and complete maintenance records.

Products
Certificate-listed eligible material
Audience
Purchasers, owners and project administrators
Issue / Rev
01 / 04
Pages
2
File
214 KB
Published
September 11, 2026
Download PDF
Cover of Maintenance Log and Photo Record
TS-WAR-150Current

Maintenance Log and Photo Record

Record each visit, cleaning method, inspections, dated before and after photographs, corrective actions and next due date.

Products
Certificate-listed eligible material
Audience
Purchasers, owners and project administrators
Issue / Rev
01 / 04
Pages
2
File
212 KB
Published
September 11, 2026
Download PDF

How to use the library

Identify the product first. Then identify the document authority.

A public guide organizes common work. An accepted order fixes product and warranty records. Project drawings and schedules complete the construction issue.

Public publication

Use the code, issue, revision, and date shown in this register. Do not rely on a detached old download.

Accepted order

Use the exact profile, finish, gauge, lengths, quantities, source records, and warranty revision identified for the purchase.

Project construction set

Use the approved assembly, substrate, drainage, attachment, interface, movement, safety, and code documents prepared for the building.

Qualified review

Resolve missing or conflicting information before fabrication or installation. Similar products are not interchangeable evidence.

Project documents

Some records belong to the project, not the public library.

Pressure capacities and attachment schedules require a project-specific or tested assembly basis. Coordinate these records with the qualified professionals responsible for your building.

Attachment schedule

Exact fastener, support, location, spacing, pressure zone, edge rule, and installation acceptance.

Roof release

Minimum slope, side and end laps, sealants, closures, supports, drainage, loading, and penetration details.

Wall assembly

Subframing, air/water/vapour/thermal layers, drainage, openings, corners, movement, and code requirements.

Engineering data

Section properties, tested configurations, spans, pressure or uplift capacities, serviceability, and limitations.

Request project-document coordination

Revision control

Updated guidance. Preserved order terms.

Public technical guidance can be corrected or expanded through a later revision. The warranty revision identified in an accepted order remains fixed for that purchase unless a written amendment says otherwise.

Publication record

Current issue
01
Current revision
03
Publication date
September 4, 2026
Superseded public editions
Issue 01, Revisions 00, 01 and 02
Canonical record
terrashield.ca/technical-documents

Technical publication questions

Do not fill missing engineering with a similar-looking answer.

The public library states what is verified, what is project-specific, and which record controls.

Are the field-coordination guides complete construction instructions?

No. They identify Terrashield products, organize verified field inputs, and explain care and inspection controls. The project's approved drawings, assembly design, supports, attachments, drainage, interfaces, code review, and qualified professionals control construction.

Do the public documents provide structural spans or fastener spacing?

No. Terrashield has not published generic spans, pressure capacities, uplift values, or attachment schedules for these profiles. Those values require an exact panel, gauge, support, fastener, orientation, boundary condition, and project or tested assembly basis.

Can I use a drawing or table from another panel manufacturer?

No. Similar appearance does not make another manufacturer's lap, fastener, load, slope, closure, sealant, or support information applicable to a Terrashield profile.

How do I know I have the current document?

Match the document code, Issue, Revision, and publication date shown in the website record and PDF footer. An accepted order may lock a particular warranty revision for that purchase even after a newer public edition is issued.

Is warranty registration mandatory?

Yes. Complete installation within 4 months after purchase and register within 30 days after installation with invoice, dates, material, photos, installer and owner details. Terrashield approval and a signed certificate are required for this limited express warranty. Mandatory statutory and existing-order rights remain protected.

Does the current material record prove installed performance?

No. The Core Series MTC reports values for a documented 26-gauge material and does not apply automatically to the wider colour collection. It does not establish complete wall or roof performance, fire classification, structural capacity, service life, AAMA 2605 compliance or warranty coverage.